Large Patch
Patching is the same as defined for small patching. A utility cut is a patch that has replaced the original pavement because of placement of underground utilities. The severity levels of a utility cut are the same as those for regular patching.
Severity | Distress Example | Description |
---|---|---|
Low | ![]() | Patch is functioning well with very little or no deterioration. |
Medium | ![]() | Patch deterioration or moderate spalling, or both, can be seen around the edges. Patch material can be dislodged with considerable effort, causing some FOD potential. |
High | ![]() | Patch has deteriorated to a state that causes considerable roughness or high FOD potential, or both. The extent of the deterioration warrants replacement of the patch. |